Abram Engineering
  • Home
  • PBS Certification and Vehicle Compliance
  • Systems Engineering
  • About us
  • Contact
Picture

Project Management

Systems Engineering

 - Generate Project Plans/Schedule
 - Team Management
 - Risk Assessments
 - Budgeting
Construction of Management Plans
 - Engineering Management Plan
 - Configuration Management Plan
 - Sustainment/Support Plan
 - Risk Management Plan
 - Through Life Support (TLS) Management Plan

Design Requirements
 - Contractual
 - Design Reviews
 - Contract Change Proposals (CCP)
 - Engineering Change Proposals (ECP)
 - Engineering Investigations (EI)

Configuration Control
 - Build State and Build Standard
 - Configuration Control Board (CCB)
 - Master Record Index (MRI)
 - Repair Parts Identification List (RPIL)

Verification and Validation
 - Construction of Test methods/plans
 - Acceptance Test Procedures
 - Acceptance Test Reports
 - Verification Cross Reference Matric (VCRM)
 - Verification by Analysis
 - Mean Time Between Failure (MTBF)
 - Mean Time To Repair (MTTR)
 - Level of Repair Analysis (LORA)
 - Air Transport

Support/Sustainment
 - Support/Sustainment Plans
 - Support processes
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Powered by Create your own unique website with customizable templates.
  • Home
  • PBS Certification and Vehicle Compliance
  • Systems Engineering
  • About us
  • Contact